As the weather warms, road construction activity is intensifying in and around Fishers. Be aware of more construction on 141st Street west of State Road 37. There are many other construction areas around the city seeing more activity.
Here is the full listing for the work week starting Monday, May 5th, as provided by the City of Fishers:
=================================
On the week of May 5, the contractor will be transitioning traffic to the West side of the road for the next phase of construction.
As of Monday (3/10), the contractor has begun reconstruction and interchange tie in on the west side of 141st street. To do this work as quickly as possible, this will require 141st St. to be closed on the west side. The closure will be in place from SR37 thru and west of Trade Center Dr. This work will involve new curbs, medians, storm sewer, subgrade treatment and pavement. See business access map here.
The Westside of 141st Street at SR37 is currently closed for construction, with SR37 North and Southbound lanes remaining open. Please review detour routes to plan ahead during this time. Thank you for your continued patience and remember to drive cautiously and safely through construction areas. View a detour for E 141st street and SR37 here, view the West detour here, and East detour here.
To learn more about the State Road 37 Improvement Project and sign up to receive text updates, visit 37Thrives.com.
DriveFishers on X as work progresses.

To learn more about the Clear Path Improvement Project and sign up to receive text and email updates, visit clearpath465.com
I-465 & I-69
Drivers will see an increase in construction along the I-69 corridor in the coming months. This work will focus on reconfiguring the interchange at I-465 and I-69. New ramps will provide direct movements from eastbound I-465 and northbound I-465 to northbound I-69. Binford Blvd. will also be reconstructed to separate local traffic from traffic entering and exiting I-69 and I-465. Access to I-69 from Binford Blvd. will remain open.
Short-Term Closures
Saturday, May 3 (9 p.m. to 6 a.m.)
- Two right lanes closed on I-69 southbound from 96th street through the I-69/I-465 interchange
- Intermittent ramp closures (20 minutes or less) after midnight:
- 96th Street to I-69 southbound
- I-69 southbound to southbound Binford Boulevard
- 82nd Street to I-465 southbound
Long-Term Closures
- Ramp from 56th Street to I-465
- Ramp from Allisonville Road to I-465 eastbound
- Ramp from northbound Binford Boulevard to I-465 westbound
82nd Street Ramps
For detour routes and additional project information, visit clearpath465.com.
121ST STREET AND HOOSIER ROAD – FUTURE ROUNDABOUT
Drivers can expect to see more construction activity at this intersection as the contractor works on utility relocation – keep an eye out for periodic lane restrictions Monday – Friday 9AM – 3PM
131ST STREET AND HOWE ROAD – FUTURE ROUNDABOUT
Drivers can expect to see more construction activity at this intersection as the contractor works on utility relocation – keep an eye out for periodic lane restrictions Monday – Friday 9AM – 3PM.
ROAD RESTRICTION ON SUNBLEST BLVD AT LANTERN ROAD
On the week of May 5th the contractor will be continuing work on repairing a drainage issue as a result there will be intermittant lane restrictions on Sunblest Blvd at Lantern Road the week of May 5 from 9am – 3pm.
136TH STREET WIDENING – ROAD CLOSURE
As of Tuesday, April 1, 136th Street between Prairie Baptist Road and Cyntheanne Road has been closed to through traffic as construction begins on the reconstruction of the roadway. Access to all of the homes and fire station off of 136th Street will be maintained only to eastbound traffic. Westbound traffic will need to follow the attached detour route. Access into Hunters Run and Silverton will be off of Prairie Baptist or Cyntheanne Road. See a map of this closure here.
SOUTHEASTERN PARKWAY RESTRICTIONS
Beginning on or after April 21st, expect to see lane restrictions along Southeastern Parkway, Cyntheanne Road and 126th Street as utilities perform aerial work along the roadway. Flaggers will be in place between 9AM and 3PM.
96TH STREET AND THE NICKEL PLATE TRAIL
There will be intermittent lane restrictions between Hague road and the entrance to Menards – between 9am and 3PM.
The 96th & Allisonville roundabout is now open and accessible in all directions, making travel smoother and safer at one of the main gateways to our City. Please proceed with caution as this is still an active construction site. Expect periodic lane restrictions the week of May 5.
2025 ROAD RESURFACING PROJECT
Beginning on Monday, May 5th our contractor will begin curb and curb ramp work in the Sawgrass Subdivision. Homeowners will be notified via door hangers prior to any curb reconstruction near their home. After ADA ramp and curb reconstruction is completed, those areas will be restored with topsoil and seed. It is the responsibility of the homeowner to water the seed for the seed to germinate. Prior to road resurfacing, residents will be notified via street signage for street parking restrictions. For additional project information, view the Capital Project Dashboard here.
View the Road Resurface Overview Map here.
The City of Fishers has partnered with the City of Carmel, Clay Township, Carmel Clay Parks and Recreation, Hamilton County, and Delaware Township to connect Heritage Park at White River and Carmel’s Hazel Landing Park with a bridge over White River. This new amenity will provide enhanced connectivity between the two communities, as well as new recreational opportunities for our residents. Click here for an aerial view. Construction is expected to occur Monday through Saturday beginning at 7 a.m. The bridge is expected to be complete in August 2025.