Latest on Fishers area road construction

With summer in full swing, the Fishers area road construction listing continues to grow.

Here is the full listing, as provided by the City of Fishers:

SPARK!FISHERS

Road closures and parking restrictions will be in effect around the downtown Nickel Plate District next week for the Spark!Fishers festival, beginning Tuesday, June 24 through Saturday, June 28.  View the full list of closures here..

JULY 4TH FIREWORKS 

Fishers Parks is proud to offer three fireworks shows throughout our community on July 4th each year – view more details here.

All fireworks shows will begin at dusk, approximately 10 p.m.

 

STATE ROAD 37 IMPROVEMENT PROJECT

State Road 37 and 141st Street

The eastside of 141st St. at SR37 is currently closed for the next phase of construction.  Traffic has transitioned to the westside, with SR37 north and southbound lanes remaining open. Please review detour routes to plan ahead during this time.  Thank you for your continued patience and remember to drive cautiously and safely through construction areas.  All construction updates will be posted to DriveFishers on X(Twitter) and 37Thrives on Facebook.  Please visit 37thrives.com to sign-up for email updates. See the detour route here and the business detour route here.

To learn more about the State Road 37 Improvement Project and sign up to receive text updates, visit 37Thrives.com.

 

CLEAR PATH IMPROVEMENT PROJECT


To learn more about the Clear Path Improvement Project and sign up to receive text and email updates, visit clearpath465.com 
I-465 & I-69
Drivers will see an increase in construction along the I-69 corridor in the coming months. This work will focus on reconfiguring the interchange at I-465 and I-69. New ramps will provide direct movements from eastbound I-465 and northbound I-465 to northbound I-69. Binford Blvd. will also be reconstructed to separate local traffic from traffic entering and exiting I-69 and I-465. Access to I-69 from Binford Blvd. will remain open.

Short-Term Closures

Friday, June 27 (9 p.m. to 6 a.m.) to Sunday, June 29 at 6a.m.

  • Northbound Binford Boulevard at 75th Street right lane closed

Saturday, June 28 (9 p.m. to 6 a.m.)

  • Southbound I-69 ramp to southbound I-465 closed

Eastbound and westbound 82nd Street ramp to southbound I-465 closed
Saturday, June 21 (9 p.m. to 6 a.m.)

  • Northbound Binford Boulevard to northbound I-69 closed at 75th Street
  • Northbound I-465 ramp to northbound I-69 left lane closed
  • Single lane open on northbound I-69 from I-465/I-69 interchange to 82nd Street

Actual dates and anticipated work may be adjusted if inclement weather or other unforeseen circumstances occur. Drivers are encouraged to plan alternate routes and allow extra travel time during overnight hours.
Long-Term Closures

  • Ramp from 56th Street to I-465 northbound
  • Ramp from Allisonville Road to I-465 eastbound
  • Ramp from northbound Binford Boulevard to I-465 westbound

82nd Street Ramps

For detour routes and additional project information, visit clearpath465.com.

 

BRIGHTSPEED FIBER INSTALLATION

Brightspeed will be installing fiber throughout the following areas: South Avalon Estates, Knoll at Thorpe Creek, Overlook at Thorpe Creek, Woods at Thorpe Creek, and Geist Overlook this week. Work will be conducted in the utility easement behind the sidewalk.

PROJECTS NORTH OF 116TH STREET

 

146TH STREET & ALLISONVILLE ROAD – HAMILTON COUNTY PROJECT 
Hamilton County, Indiana – Please be advised, the traffic phasing switch has occurred and we are in a new traffic pattern.  Please use extreme caution when driving through the work zone. Drivers should expect traffic delays when traveling through the construction zone during these periods.

Anticipated Completion Date: FALL 2025

For additional project information, visit the 146th Street & Allisonville Rd. Project Page.

FLORIDA ROAD CLOSURE

As of June 25 Florida Road has been closed between Cyntheanne Road and 113th Street to allow the contractor to install a raised crosswalk at the Geist Greenway crossing. Drivers can expect Florida Road to reopen on Monday June 30.

121ST STREET AND HOOSIER ROAD – FUTURE ROUNDABOUT

A full closure is in place at 121st and Hoosier Road for the construction of a roundabout, this will be a 60 day closure. The detour route is 126th Street, Cumberland Road, 116th Street, see map here.

131ST STREET AND HOWE ROAD – FUTURE ROUNDABOUT

A full closure is in place at 131st and Howe for the construction of a roundabout, this will be a 60 day closure. The detour route is Cumberland Road, 141st Street, and Promise Road, see map here.

136TH STREET WIDENING – ROAD CLOSURE

As of Tuesday, April 1, 136th Street between Prairie Baptist Road and Cyntheanne Road has been closed to through traffic as construction continues on the reconstruction of the roadway.  Access to the homes and Fire Station #97 will be maintained only to eastbound traffic.  Westbound traffic will need to follow the signed detour route.  Access into Hunters Run and Silverton is off of Prairie Baptist Road or Cyntheanne Road.  See a map of this closure here.

OLIO ROAD LANE RESTRICTIONS BETWEEN GEIST RESERVOIR BRIDGE AND 126TH STREET – HAMILTON COUNTY PROJECT

Hamilton County – Please be advised, drivers should expect intermittent lane closures on Olio Road for paving operations.  The lane closures will take place on Olio Road between Geist Reservoir bridge to 126th Street.  The estimated completion date is Wednesday, July 2, 2025.  Please use extreme caution while driving through this construction zone.

PROJECTS SOUTH OF 116TH STREET

96TH STREET LANE RESTRICTIONS – UPCOMING OVERNIGHT CLOSURES
As of June 6th, drivers can expect lane restrictions as the contractor has closed the inside lanes for both eastbound and westbound traffic for work on the construction of the Nickel Plate Trail Bridge. There will be one lane for westbound traffic and two lanes for eastbound traffic between Masters Road and Hague Road.

 

Drivers can also expect overnight FULL closures on the following nights: July 10th, 11th, 14th and 15th. These will be in place from 8pm to 6am each night.

TRAIL CONSTRUCTION 

Beginning on or after July 7th, drivers on 106th Street between Cumberland Road and Fall Road should expect lane restrictions from 9 AM to 3 PM due to ongoing trail construction. Please plan for potential delays and exercise caution in this area.

2025 ROAD RESURFACING PROJECT 
Beginning on the week of June 30 our contractor will begin base repair operations in the Sawgrass Subdivision. Homeowners will be notified via door hangers prior to any curb reconstruction near their home. After ADA ramp and curb reconstruction is completed, those areas will be restored with topsoil and seed. It is the responsibility of the homeowner to water the seed for the seed to germinate. Beginning on or after June 30th the contractor will begin concrete operations in Summerlin Trails.

View the Road Resurface Overview Map here.

HERITAGE PARK BRIDGE – TRAIL CLOSURE
The City of Fishers has partnered with the City of Carmel, Clay Township, Carmel Clay Parks and Recreation, Hamilton County, and Delaware Township to connect Heritage Park at White River and Carmel’s Hazel Landing Park with a bridge over White River. This new amenity will provide enhanced connectivity between the two communities, as well as new recreational opportunities for our residents. Click here for an aerial view. Construction is expected to occur Monday through Saturday beginning at 7 a.m.