  • 136th Street: (Cyntheanne → Prairie Baptist) – Traffic pattern change
  • 116th Street and Allisonville Road Intersection Improvements: Ongoing lane restrictions for intersection improvements
  • Hague Road Lane restrictions: Lane restrictions (106th → Nickel Plate Trail)
  • SR37 and 141st: Inside SB lane closure for sod installation (5/15). Rolling Closures the week of May 18
  • Cumberland Road between 106th & 116th: Lane restrictions for utility work in advance of road reconstruction 9AM-3PM

2026 Fishers Sprint Triathlon 👟

The Fishers Sprint Triathlon powered by FAST will take place Saturday, May 16, beginning at 7:30 a.m. at Geist Waterfront Park. Participants will compete in swimming, biking, and running events throughout the surrounding Geist area. Motorists should expect temporary road impacts and brief delays along portions of the race course during the morning hours, with bike course closures expected through approximately 9 a.m. and run course impacts through approximately 9:45 a.m.

Residents are encouraged to plan ahead, use caution when traveling near the event, and consider alternate routes when possible. View course maps and event details here: https://www.trisignup.com/Race/FishersTri/Page/Course-Maps

🚛Touch-A-Truck 🚒

Fishers’ annual Touch-A-Truck event returns Monday, May 18, from 4 to 7 p.m. at the Nickel Plate District Amphitheater! Families can explore big rigs and city vehicles up close, including snowplows, fire trucks, police vehicles, construction equipment, and more. The free event will also feature live demonstrations from Fishers Public Works, Police, and Fire departments, plus kids’ activities and food vendors. Expect increased activity and temporary road closures around the Municipal Drive area during the event.

Parking + Road Closures

Road Closures

Beginning at 3 p.m. Monday, May 18, 2026, the south side of Municipal Drive circle, including the Central Green area, will be closed to traffic. Patrons entering from 116th Street will be rerouted south of Central Green. Access to Municipal Drive will remain available via North Street and Fishers Center Drive.

The following parking areas will be closed for the duration of the event:

  • City Services Building north parking lot (3 Municipal Drive)
  • Station 91 north and south parking lots (2 Municipal Drive)
  • Dog Park parking lot

All listed parking closures will be effect all day on May 18.

Parking

Free street and garage parking is available throughout the Nickel Plate District. Free garage parking is available in the following parking garages:

  • Flats at Switch Garage
  • Police Station Garage
  • Nickel Plate Station Garage
  • Spark Garage
  • First Internet Bank Garage

Accessible parking is available on a first-come, first-served basis at the south City Services Building parking lot at 3 Municipal Drive. An license plate, placard, or tag must be displayed to park at this location. Overflow accessible parking can be found in the Fishers Police Department parking garage across the street at 4 Municipal Drive.

Learn more at Fishers Parks Touch-A-Truck

🛠 Ongoing Road & Utility Work

Brightspeed Fiber installation

Brightspeed will be installing fiber throughout Avalon of Fishers this week. Work will be conducted in the utility easements behind the sidewalk.

Upcoming Road Improvements at 116th Street & Allisonville Road

What’ s Happening

The City of Fishers is improving the intersection of 116th Street and Allisonville Road to enhance traffic flow and safety. While the project was originally planned as a roundabout, additional analysis showed the improvements could be achieved through less invasive roadway changes. Construction is expected to begin on or after March 30 and continue through October 2026.

What to Expect

  • The City of Fishers will be improving left-turn lanes in all, replacing sidewalks & ADA ramps, & upgrading traffic signals to improve traffic flow & safety.
  • Business access will remain open
  • Intersections will remain open, but drivers will experience lane shifts, restrictions, & slower travel times, especially during peak hours.
  • Roadway projects are weather-dependent and schedules may change

Project Update (4/08/2026)

Construction is expected to begin the week of April 13 and continue through late October, weather and material availability permitting. Initial work will include construction signage and signal-related activity, followed by intersection improvements, curb and ramp work, sidewalk work, and paving later in the season.

Learn more on the Drive Fishers page and follow @DriveFishers on X for updates. Questions? Email Drive Fishers.

Projects North of 116th Street

121st and Hoosier Roundabout

Lane restrictions are expected in the area of 121st and Hoosier Road Roundabout as the contractor works on restoration and final punchlist items. All work is weather dependent.

136th Street Widening – ROAD CLOSURE

136th Street Widening – Prairie Baptist Rd to Cyntheanne Rd

Construction Update: Local drivers should expect a traffic pattern change while paving operations continue.

Access to the single homes and the fire station will be maintained for eastbound traffic; however, the road will remain closed to through traffic.  Access to Abbott Commons and Silverton will be off of Prairie Baptist Road and access to Hunters Run will be off of Cyntheanne Road or Southeastern Parkway.  See a map of this closure here.

136th Street Widening – Southeastern Parkway to Prairie Baptist Road

Construction is underway and currently in the utility relocation phase.

This project will:

  • Convert the road to a boulevard with a raised median
  • Add multi-use paths on both sides
  • Install new pavement, curb/gutter, and storm sewer system

Expect intermittent lane restrictions.

For more details visit our Capital Projects Dashboard here.

State Road 37 Improvement Project

State Road 37 and 141st Street

**141st Street is now open to right in right out traffic on the eastside of State Road 37. Drivers still do not have access to go across the 141st Street bridge over State Road 37.**

SR 37 Weekly Construction Update (May 18–21)

Crews are making strong progress along the SR 37 corridor and remain on track to complete sodding in the mainline median today. While no full lane closures are planned next week, motorists should expect periodic slowdowns and rolling closures as crews continue finishing work.

Upcoming Work Schedule

  • Monday, May 18: Mainline grooving on northbound SR 37 with intermittent closures; landscaping installation on the 141st Street bridge.
  • Tuesday, May 19: Crews will install thermal long lines on SR 37.
  • Wednesday, May 20: Installation of raised pavement markers and roadway corrugations. Rolling closures will occur with crash trucks following milling and vacuum operations.
  • Thursday, May 21: Additional intermittent closures may occur if weather impacts scheduled work earlier in the week.

Traffic & Safety Improvements

Additional signage has been installed at South Mundy, including “No Left Turn” and “Do Not Enter” signs. In addition, paving at the Monical’s Drive area on far east 141st Street is now complete, marking the completion of all paving activities in the area.

Drivers are encouraged to use caution, expect slower traffic at times on SR 37, and remain alert for crews and rolling work zones throughout the corridor.

141st Street & SR37

The State Road 37 Improvement Project is in its final interchange with construction of the 141st Street and State Road 37 now underway. The anticipated completion of this project is Summer 2026. 

Expect delays, slower traffic, and changing access routes throughout the day.

All construction updates will be posted to DriveFishers on X(Twitter) and 37Thrives on Facebook.  Please visit 37thrives.com to sign-up for email updates. Find construction updates at 37thrives.com and follow DriveFishers on X as work progresses.

Anticipated Completion: Summer of 2026

Trail Construction – (131st and 106th) – Upcoming Milling and Resurfacing Operations

131st Trail Project Update

Crews will complete final punch list work as weather allows.

Expected Impacts:

106th St at Mollenkopf Rd

Lane restrictions from 9 AM to 3PM

131st St (Lantern Rd → Nickel Plate Trail)

Lane restrictions from 9 AM to 3 PM

🚧2026 Road Resurfacing Projects🚧

  • Concrete curb and ramp work will be ongoing in the Sumerlin Trails neighborhood the week of May 18, weather dependent. Milling operations will follow.

What to Expect:

  • Door hangers for curb/ADA ramp work
  • Temporary restoration with topsoil and seed
  • Residents responsible for watering new seed
  • Street signage for parking restrictions

Additional notices will be provided as work progresses.

All work is weather dependent.

🔗 Additional Information

For additional project information, view the Capital Project Dashboard here. View the Road Resurface Overview Map here.

🛣️ Projects around Fishers 🚧

The following projects are managed by partner agencies and not the City of Fishers.

Clear Path Improvement Project

I-465 & I-69 

More than 80% of Clear Path 465 construction is complete on the northeast side of Indianapolis. Drivers will see continued improvements in 2026 as new lanes and ramps open, and work continues on the reconfigured I-69/I-465 interchange. The majority of construction will be complete in summer 2026, with intermittent lane and ramp restrictions expected later in the year as crews finish remaining work on mainline I-465, I-69, and the I-69/I-465 interchange.

Clear Path – 2025 Construction Guide

I-69 South – New Traffic Pattern

Indiana Safe ZonesThe Safe Zones speed control program remains active in the Clear Path construction zone. This program uses automated systems to monitor speeds in specified work zones. The goal of the program is to keep workers, drivers, and their passengers safe by reducing excessive speeding in work zones. It’s important to slow down in construction zones and drive without distractions. Learn more about Safe
Zones at SafeZonesIN.com

For schedule updates, follow the project on Facebook, X and Instagram, and subscribe to email and text message alerts at  ClearPath465.com.

Upcoming Short-Term Closures

Drivers can expect the following closures from 9 p.m. to 6 a.m.:

Friday, May 15

  • Brief, 20-minute stoppages on the ramp from eastbound I-465 to northbound I-69
  • Brief, 20-minute stoppages on the ramp from eastbound I-465 to southbound Binford Boulevard
  • Ramp from eastbound I-465 to Allisonville Road closed
  • Right lane closed on eastbound I-465 between the White River and Allisonville Road

Long-Term Closures

  • Ramp from 56th Street to I-465 northbound
  • Ramp from Allisonville Road to I-465 eastbound
  • Ramp from northbound Binford Boulevard to I-465 westbound

82nd Street Ramps