Weekly Fishers-Area Road Construction Report

It is officially summer so the road construction listing in and around Fishes continues to be a long one.  Be aware of the Spark Fishers Festival coming up June 26 & 27 that will impact traffic in the downtown Fishers Nickel Plate District those two days.

Here is the summary of major area construction, followed by the complete list, as provided by the City of Fishers:

  • 96th Street and Cyntheanne Road – Full Closure -Follow detour route
  • 136th Street Widening – Southeastern Parkway to Prairie Baptist Road – Follow detour route
  • 116th and Allisonville Intersection Improvements Project – Down to one lane in all directions
  • Lantern Road – Closure at Morgan Drive from June 8 – 19
  • Southeastern Parkway & Olio Road Roundabout Improvements – Periodic lane restrictions

SPARK!Fishers – Various road closures & Parking restrictions

 
SPARK!FISHERS TRAFFIC IMPACTS
 

As Fishers prepares for the annual SPARK!Fishers celebration, residents and visitors are encouraged to plan ahead for temporary road closures, parking restrictions, and traffic impacts in the Nickel Plate District. For the most up-to-date information, including closure maps, parking details, shuttle information, and event logistics, visit the official SPARK!Fishers Road Closures & Parking Restrictions page here.

MAJOR CLOSURES AND DETOURS
 

96th Street & Cyntheanne Road – CLOSURE IN PLACE

Construction of the new roundabout at 96th Street and Cyntheanne Road has begun and a full closure is in place at this roundabout.
What Drivers Should Expect

  • Full intersection closure to through traffic
  • Signed detour routes around the intersection
  • Local access maintained for nearby properties
  • Additional travel time in the area

View the detour route here.

Detour Map

 

 136th Street Widening – Southeastern Parkway and Prairie Baptist Road

The 136th Street Widening Project has transitioned into Phase 2 This next phase will focus on improvements between Southeastern Parkway and Prairie Baptist Road.
136th Street is closed to through traffic within the project limits. Drivers should follow the signed detour route using Southeastern Parkway and Prairie Baptist Road to reconnect with 136th Street.
This major improvement project will transform 136th Street from a rural two-lane roadway into a modern boulevard featuring:
• Raised medians
• New multi-use paths on both sides of the road
• New pavement, curb & gutter
• Storm sewer infrastructure upgrades
Motorists should expect changing traffic patterns and additional travel time in the area and follow posted detour signage. Please drive cautiously and stay alert near work zones.

View detour map here.

Detour Map

 

Road Improvements at 116th Street & Allisonville Road

Project Update
Traffic is down to one lane in all directions, drivers should seek an alternate route. Concrete medians have been removed prior to reconfiguring the medians.
What’s Happening
The City of Fishers is improving the intersection of 116th Street and Allisonville Road to enhance traffic flow and safety.
While the project was originally planned as a roundabout, additional analysis showed the improvements could be achieved through less invasive roadway changes. Construction is expected to continue through October 2026, weather and material availability permitting.
What to Expect

  • Improved left-turn lanes
  • Sidewalk and ADA ramp replacement
  • Traffic signal upgrades
  • Business access maintained throughout construction
  • Lane shifts, restrictions, and slower travel times, especially during peak hours

Initial work includes construction signage and signal-related activity, followed by intersection improvements, curb and ramp work, sidewalk work, and paving later in the season.

Lantern Road at Morgan Drive

From June 8-19 Lantern road will be closed at Morgan Drive, detour signs will be posted for drivers. Please seek an alternate route.

UTILITY WORK
Cumberland Road Utility Work – Duke Project

Lane restrictions continue between 106th Street and 116th Street from 9 a.m. to 3 p.m.

Brightspeed Fiber Installation

Brightspeed will be installing fiber throughout Avalon of Fishers this week. Work will be conducted in utility easements behind the sidewalk.

PUBLIC WORKS CONSTRUCTION – 126TH STREET
Beginning Monday, July 13, crews will perform concrete joint sawing and sealing on 126th Street between Parkside Drive and Promise Road.

Single-lane restrictions will be in place on both eastbound and westbound 126th Street from 7 a.m. to 4 p.m. Traffic may be stopped for short periods while equipment enters and exits the lane closures and as crews work through intersections.

Work is expected to take up to 12 days and will occur Monday through Saturday, weather permitting. Motorists are encouraged to use caution and allow extra travel time through the area.

PROJECT UPDATES
 

Neighborhood Resurfacing

Road resurfacing work continues throughout Fishers, with crews currently completing concrete operations in Rosewood, Weaver Woods, Weaver Woods North and Weaver Creek. Milling and paving operations are ongoing in Sumerlin Trails.
Additional resurfacing work is expected to begin soon along Promise Road, 131st Street, and Howe Road. Work will include base repairs, roadway milling, asphalt paving, grooving, and pavement marking installation.
What Drivers Should Expect

  • Temporary lane restrictions and shifting traffic patterns in active work zones
  • Rolling traffic control operations with flaggers on Promise Road, 131st Street, and Howe Road
  • Traffic will remain open and moving through construction areas
  • Short-term delays during active work operations

Residents and motorists are encouraged to use caution, follow posted signage, and allow extra travel time when driving through construction zones. All work is weather dependent and subject to change.

Capital Projects Dashboard

 

Southeastern Parkway & Olio Road Roundabout Improvements

The City of Fishers will begin reconstructing the roundabout at Southeastern Parkway and Olio Road in mid-June to improve safety and traffic flow at one of the region’s busiest intersections, which has a history of frequent non-fatal crashes. The project will be completed in November 2026 during 3 phases.
The project will add more room for vehicles, reduce backups on nearby roads, and make the roundabout easier to navigate. When completed this fall, the roundabout will help drivers choose the correct lane sooner, move through the intersection more safely, and reduce rear-end and side-swipe crashes.
Phase 1 – Mid-June – Late July
The roundabout will remain open with lane restrictions.
Crews will improve nearby 136th Street and permanently make it a two-way road, providing a detour option during Phase 2. They will also build a new connection road between 136th Street and Southeastern Parkway to the east for easier traffic flow during construction.
Alternate routes are encouraged but not required during Phase 1.

More information and traffic maps will be announced before construction starts.

🚗 REGIONAL CONSTRUCTION
Hamilton County Highway Department

Hamilton County Resurfacing Project

Hamilton County is expected to begin milling and resurfacing operations next week along 96th Street, progressing north toward the Geist Bridge. In addition to roadway resurfacing, crews will complete ADA-related concrete improvements throughout the corridor.
What Drivers Should Expect

  • Lane restrictions during active construction
  • Traffic maintained through the work zone
  • Occasional delays during milling, paving, and concrete operations

Work is anticipated to be completed within approximately two weeks, weather permitting. Construction schedules are subject to change, and additional updates will be provided as more information becomes available.

EAST CARMEL PEDESTRIAN SAFETY IMPROVEMENTS:
April 1 – early August
As of April 1, extensive work has begun on the east side of Carmel to install raised pedestrian crosswalks within several roundabouts along Hazel Dell Parkway and Gray Road.

Phase 4 (46-day closure, summer break) June 22 – August 10
116th Street and Hazel Dell Parkway

Phase 5 (30-day closure) TBD
Main Street and Gray Road

All raised pedestrian crosswalk installations are set for completion in September, reinforcing Carmel’s ongoing commitment to student and neighborhood safety.
For more details visit the City of Carmel’s website.

STATE ROAD 37 IMPROVEMENT PROJECT

STATE ROAD 37 IMPROVEMENT PROJECT

🛣️State Road 37 and 141st Street🎆

The State Road 37 Improvement Project at 141st Street is now substantially complete, and the City celebrated the official ribbon cutting for the new interchange on May 26.

Motorists should expect periodic lane restrictions and intermittent work activity throughout the corridor as contractors complete final punch-list items and remaining project details, including landscaping and minor finishing work.

Drivers are encouraged to continue using caution in the area while crews complete these final activities.

CLEARPATH IMPROVEMENT PROJECT

 

Upcoming Short-Term Closures

Drivers can expect the following from 9 p.m. to 6 a.m.
Friday, June 19

  • One lane closed in both directions of 75th Street near Binford Boulevard

Long-Term Closures

82nd Street Ramps
82nd Street ramps – current configuration

New lanes of I-465, Allisonville Road ramp NOW OPEN

Click HERE to learn more. 